Day 12 constructing and testing lower level

This day was focused on construction and testing of the lower level of our gallery piece.  We didn’t place anything permanently assembled because we painted the foundation in the afternoon.  We found the steps designed for the lower level worked well, but will need some adjusting.

Day 12 1Day 12 2Day 12 3Day 12 4Day 12 5