Day 13 and 14 More measuring, constructing, and testing

These two days we have been assembling the final structure and testing our steps.  We have not done a final run through, but have tested the finish and the transition from the top level to the lower level.  We had to take correct measurements and cut a hole in the top level for a funnel.

Day 13 1Day 13 2

 

Day 13 3Day 13 4